📊 VibeIQ CSM Customer Tracker

Week of May 04 – May 10, 2026 · 22 Live customers · Generated 2026-05-15
Live Customers
22
🔴 Critical Health
1
🟡 At Risk
10
💸 Over Budget
2
🔥 Burning Fast
4
🗓 Renewal <90d
2
🚨 Crit/High Tickets
70

Master · All Live Customers

Click a customer to jump to detail · Hover notes to expand
CustomerHealthCSM NotesHrs Last WkUsed / BudgetPaceHarvest EndRenewal
👤 Bailey Heckel · 2 accounts
Ralph Lauren🟢3/9: Good meeting reset with Robyn recently. Looking to launch Home in platform, waiting to hear back on next steps. Team is looking for a review of their open items and ERs.19.7h (▲ 18.1h)38.42h / 40h (96%)Burning Fast (+84.2%)Mar 31, 2027 (320d)Mar 31, 2027 (320d)
lululemon🟡3/9: Onsite went well, excitement about AI. Need to get in earlier in planning, understand upcoming go-lives more, trying to map more deeply with Char, and Scott as a next step.1.5h (▲ 1.5h)4.75h / 40h (12%)Under (-33.2%)Nov 30, 2026 (199d)Nov 30, 2026 (199d)
👤 Lauren Faranda-Clasen · 3 accounts
Converse🟢3/9: Team is working through their RIF and subsequent restructure. Need to connect with LT who connected with their LT. Next steps is to do KBO, and QBR. Bridget Foley recieved a promotion in scope, and still oversees VibeIQ.3.5h (→ 0h)57.33h / 240h (24%)Under (-54.7%)Jul 31, 2026 (77d)Jul 31, 2026 (77d)
The Gap, Inc.Update – recently live75h (▲ 2.6h)$488.5K / $713.9K (68%)Under (-31.6%)Jan 31, 2026 (expired)Oct 15, 2028 (884d)
Veronica Beard🟡KBO held, continues to take up time, out of hours. Value realizing exercise being done internally, if had to renew today ' unsure' given that value hasn't been established by leaders. One mission critical ER recently submitted.0h64.09h / 60h (107%)Burning Fast (+59.3%)Nov 21, 2026 (190d)Nov 21, 2026 (190d)
👤 Oriana Coburn · 13 accounts
Agron🟡3/24: Established new process for sales reps to create account specific plans and enter door count and forecast data, which then pulls into their account lineboards in Showcase. Jeff pleased with prioritization of Showcase parity work. On old pricing and currently over-utilizing Plan app.5.5h (▲ 5.5h)5.5h / 120h (5%)On Track (+2.1%)May 04, 2027 (354d)May 05, 2028 (721d)
Alo Yoga🟡3/9: Considering adding 20 more seats, working on pricing as a next step.2h (▲ 2h)2.5h / 120h (2%)Under (-8.1%)Apr 06, 2027 (326d)Apr 06, 2027 (326d)
Huckberry🔴3/24: Churn risk due to lack of adoption. Allysa, Bailey, Oriana connecting with Kelly and Merch team on Thursday for a discovery call. Goal: Understand the tools they are using today, process for line planning going forward, and help them envision art of the possible with VibeIQ.0h0h / 30h (0%)Under (-36.8%)Dec 30, 2026 (229d)Dec 30, 2026 (229d)
KNS International🟢3/24: Internal turnover, but Kelsey is a great champion; New user training held for VP of merch; Bringing on a designer in April who will start using Vibe.0h4.17h / 60h (7%)Under (-22.4%)Jan 26, 2027 (256d)Jan 26, 2027 (256d)
Kizik🟢3/24: Opportunity for an upsell. Currently they have 13 full, and 7 view/comment, but are using 16 full and 17 view/comment. Approaches for upsell: 1. 25 Full Licenses - 60 licenses (upsell = $37,000) 2. 20+ 5 V/C - 60 licenses (upsell = $23,600) Relationship with PD team growing, Heather has more support leading to increase in config requests.0.9h (▼ 4.1h)51.85h / 50h (104%)Ahead (+10.3%)Jun 07, 2026 (23d)Jun 05, 2026 (21d)
L.L.Bean🟢3/24: Brian, Patrick, Oriana onsite 4/9. Brian presenting Chapter 2 AI strategy to exec team. Upsell at risk - VibeIQ expansion is under review alongside other tech investments, and full $100k allocation is unlikely.0h0h / 60h (0%)Under (-24.7%)Feb 12, 2027 (273d)Feb 12, 2027 (273d)
Malbon Golf🟡3/24: Participating in beta testing AI plug-in. A lot of post implementation config requests which have been time consuming on support side. Notable product experience frustrations out of implementation – e.g. Showcase functionality, slowness of Plan app - this has been communicated to Dan.0h (→ 0.1h)9.79h / 60h (16%)Under (-62.5%)Jul 30, 2026 (76d)Jul 30, 2027 (441d)
Mission🟢1.7h (▲ 1.7h)22.19h / 30h (74%)Burning Fast (+20.7%)Oct 31, 2026 (169d)Oct 31, 2026 (169d)
Rifle Paper🟢3/24: Overall, Emily and Rachel are happy with product performance, and partnership. KBO needs to be scheduled - planning for May. Haley working on upsell to get creative in, and sales team using VibeIQ for sell-in.3.2h (▲ 0.7h)32.79h / 60h (55%)Under (-35.5%)Jun 19, 2026 (35d)Jun 20, 2027 (401d)
Spanx🟡3/24: Underutilizing licenses (20 active users in last 3 months). Spanx expressed interest in a sell-in demo for their sales team. Scheduled with Pam on 4/2. Quach is scheduling time with Sarat (ahead of QBR - to be scheduled after that connect).0h28.01h / 120h (23%)On Track (-3.2%)Feb 07, 2027 (268d)Feb 06, 2027 (267d)
Stuart Peters🟡3/24: Onsite in early April after PI Apparel. Participating in beta testing AI plug-in. Significantly under-utilizing licenses (currently using around 35) - no clear path to get to 75.0h9.5h / 30h (32%)Under (-10.6%)Dec 10, 2026 (209d)Dec 10, 2028 (940d)
Vera Bradley🟡3/10: Project working wrapping up. The "handoff" to CSM will be scheduled next week.3/10: Project working wrapping up. The "handoff" to CSM will be scheduled next week.0h (→ 0.2h)47.43h / 60h (79%)Burning Fast (+34%)Nov 30, 2026 (199d)Nov 30, 2027 (564d)
Xero ShoesProd configured and data load completed. Training delayed; currently scheduled for 2/26-3/5.0h3.33h / 30h (11%)Under (-42.5%)Oct 30, 2026 (168d)Oct 31, 2027 (534d)
👤 Quach Hai · 4 accounts
Fanatics IncAwaiting guidance from Fanatics on project0hFeb 27, 2026 (expired)Feb 24, 2028 (650d)
Michael Kors🟡Some outstanding questions before we move forward on an SOW for their retail teams. 3/9: Working on KBO as a next step.0h11.43h / 156h (7%)Under (-20.4%)Feb 01, 2027 (262d)Feb 01, 2028 (627d)
New Balance🟡3/9: Recent had a meeting for Product, and upcoming KBO. Still behind on some Flex support issues. They have been patient because they are also understaffed. They are requesting for 4 org copies in the next few months – Grant has this request under control7.6h (▲ 5.8h)7.57h / 40h (19%)Ahead (+7.9%)Apr 03, 2027 (323d)Apr 20, 2027 (340d)
URBNProject is back on track; go-live is currently planned for 4/6. Integration reveal was 2/19 with majority of the mappings working as intended. Big shout out to our engineering team (Chris & Matt)!3.8h (▼ 7h)Dec 26, 2025 (expired)Jul 20, 2028 (797d)

Ralph Lauren 15

CSM: Bailey Heckel · ralphlauren.com · Billable to Support Contract Apr26-Mar27 ↑ Back to Master
🏥 Health
🟢
Hrs Last Wk
19.7h (▲ 18.1h)
Used
38.42h
Budget
40h
📈 Pace
Burning Fast (+84.2%)
🗓 Renewal
Mar 31, 2027 (320d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
96% of 40h support contract burned in just 6 weeks (Burning Fast +84%). At current pace, contract will exhaust ~10 months early. Renewal conversation should happen now, not in Q4.
📊 PATTERN
Both new Critical tickets this week (#4245, #4277) relate to WHSL pricing/MU% override formulas. Likely shared root cause in pricing attribute logic — flag to engineering as a cluster, not 2 separate issues.
✅ ACTION
Ticket #4277 (Backfill Needed WSHL MU% OVR) has an explicit customer deadline of Thursday AM. Confirm Melba/Hannah have committed coverage before EOD Wednesday.
📅 CADENCE
Hours spiked from 1.6h → 19.7h week-over-week (12.3x). Driven by Melba Lewis (24h all-time, 51%). Either Ralph Lauren entered an intensive phase or this is a one-week aberration — worth verifying with Melba.
✨ OPPORTUNITY
327 days to renewal and 327 licensed / 623 active users — overage signals demand. Pair pricing conversation with seat expansion proposal during the meeting reset Robyn flagged in your notes.
🆕 NEW
📬 OPEN
⏳ Pending
⏸ On Hold
🔍 In Review (ER)
⚠ 15 CRITICAL/HIGH TICKETS OPEN · 2 Critical · 13 High · review before customer call
Requester: Sandeep Nakkarike Dattatraya · Status: Pending · Created: 2026-05-06
"We added a new attribute “WHSL Price - US (Override)” when a value is updated in this attribute “MU% WHSL - US (Override)” will become blank achieved by using below formula. And this “WHSL Price - US (Override)” will be used in the calculation of “WHSL Price – US”. What we are observing in PROD is t…"
Requester: Robyn Frye · Status: Pending · Created: 2026-05-12
"Hi Vibe team, Requesting this as critical because we'll want to resolve by Thursday AM latest. We are doing a clean up of pricing and will need WHSL MU% OVR backfilled for a set of PRL material IDs. Because the set of data is across seasons and across product categories, pulling the plan names is go…"
Requester: Sairam · Status: Pending · Created: 2025-04-02
"Hi Team, Project Level carryover is not set to true when the options are not carried over along with the item carryover. Steps to reproduce. 1. Carry over an item from season1 to season2 without any option carryover. 2. Add a new option in carried over item and publish. 3. In payload check carryover…"
Requester: Frankie Dox · Status: Open · Created: 2025-10-08
"The new item create feature only allows to choose an item type when creating item families, but based on RL use cases, users need a way to create options and choose the item type. It should work similarly to the way the new item feature works where users can choose to create an item family or an opt…"
Requester: Romil Kothari · Status: Pending · Created: 2025-12-17
"Hi Team, We need your help to export the below configurations from RL QA Org to RL Test Org. Also, please take a backup of RL Test Org configurations before making the transfer from QA, in case the test org becomes unstable due to some mismatch in config and data, so we can roll back Test org to its…"
Requester: Kathlyn Monahan · Status: Open · Created: 2026-01-13
"In 3 different Men's Knits Plans an end user noticed that for item number 534735, the item name and all of the attributes have been changed. This is now causing the entire plan(s) to have errors and stopping the end user from making urgent updates needed. We are requesting Vibes team to help look at…"
Requester: Sandeep Nakkarike Dattatraya · Status: Open · Created: 2026-01-28
"Hi - We are observing that default Style# 285785140 is getting populated to attribute "Created From Style#" on the styels which are not created from this style. This is happening on multiple styles. 1. Want know why the Default Styel#285785140 is getting assigned and how it can be fixed. 2. This cha…"
Requester: Romil Kothari · Status: Pending · Created: 2026-03-06
"I am trying to extract Item Library data from RL Prod Org (orgSlug: 'ralph-lauren-prod') by using the extractItems.ts file (attached) to work on data backfill on one of the attributes at Item level. The file is giving error when executed using the command as below. This seems to be an error related …"
Requester: Sandeep Nakkarike Dattatraya · Status: Pending · Created: 2026-03-11
"Urgent - please help resolve this Carryover issue. User “McKayla.Bradley@RalphLauren.com” is carrying over Material from Spring 26 plan to Cruise 26 plan and attributes marked for carry over are not copying over in Cruise 26. **Example SAP Material#:** 200P08874001 **Attributes not Carrying over** -…"
Requester: Frankie Dox · Status: Open · Created: 2026-03-11
"Hi there - we have a user attempting to access vibe through a share link who has an apostrophe in their email: Hilary.O'Brien@RalphLauren.com As this user does not have a license, we try to enter their email in the share link settings and it gives an error “Invalid Email". This is urgent as it is bl…"
Requester: Sandeep Nakkarike Dattatraya · Status: Pending · Created: 2026-03-30
"Please move the “Hardware Finish” attribute from **Option **level to **Overridable** level, details below. **Attribute/Property:** Hardware Finish (hardwareFinish) **Current** – Defined at Option **Change Needed** – 1. Move the attribute to **Overridable** level 2. Existing data at Option should be …"
Requester: Sandeep Nakkarike Dattatraya · Status: Pending · Created: 2026-04-24
"Hi Vibe Team, We are observing an issue during “Size Extension” where user is trying to Extend from Base Style# 710966292 (Vibe ID – 119751) and the Size Extension Material are getting created in a new Style# 711B62431 (Vibe ID – 331811) instead of getting created under the already existing Size Ext…"
Requester: Dawn Chesko · Status: Open · Created: 2026-04-28
"With the new update to locking frames, I have noticed that 3/5 times when locking/unlocking frames (selectively or all) that it messes up Dynamic text. The only change is the lock and unlock of the frame . See video for an example, it has affected dynamic text both when locking and unlocking. IT is …"
Requester: Kathlyn Monahan · Status: Pending · Created: 2026-05-11
"Request to have image URLs to be uploaded overnight during IST hours. Please see attached list of SAP Material #s with corresponding Image URLs to be uploaded into VibeIQ."
Requester: Romil Kothari · Status: New · Created: 2026-05-13
"We are configuring the new RL Org Name: Ralph Lauren Prod (Copy X_N59EExWV_TcJZw) Identifier: **ralph-lauren-prod-copy-X_N59EExWV_TcJZw** When trying to install the existing Apps from other RL Orgs, we got error as attached. We would request you to help us installing these Apps to the new Org. Also …"
Team MemberTaskHoursLast Logged
Melba Deena LewisProduct Support7hThu May 07
Chris BrownIntegrations6hWed May 06
Prashant PawarConfiguration3hThu May 07
Melba Deena LewisConfiguration2.5hFri May 08
Melba Deena LewisCustomizations0.7hWed May 06
Hannah CaseyGeneral Meetings0.5hWed May 06
TOTAL19.7h
Team MemberHours% of totalLast Active
Melba Deena Lewis24h51%Thu May 14
Hannah Casey10.2h22%Wed May 13
Chris Brown6h13%Wed May 06
Lorna Curtis3.2h7%Tue May 12
Prashant Pawar3h6%Thu May 07
Melissa Serrano0.8h2%Tue Apr 28
TOTAL47.3h100%
TaskHours% of totalLast Active
Configuration18.4h39%Wed May 13
Product Support12h25%Thu May 14
Integrations6h13%Wed May 06
General Meetings4.5h10%Wed May 13
Data / Loads3.8h8%Tue May 12
Account Management2h4%Wed Apr 29
Customizations0.7h1%Wed May 06
TOTAL47.3h100%

lululemon 7

CSM: Bailey Heckel · lululemon.com · Billable to Support Contract Nov25-Nov26 ↑ Back to Master
🏥 Health
🟡
Hrs Last Wk
1.5h (▲ 1.5h)
Used
4.75h
Budget
40h
📈 Pace
Under (-33.2%)
🗓 Renewal
Nov 30, 2026 (199d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
At Risk health + 200 days to renewal + 0.73h weekly avg = textbook churn signal. Low Usage and 'Lack of strategic engagement' both flagged. Renewal probability deteriorates further every week without exec touch.
📊 PATTERN
4 of 7 Critical/High tickets created in the past 30 days (#4141, #4177, #4210, #4211) all relate to board/frame/PPT export functionality. This is a UX cluster — and the customer is documenting issues without seeing fixes, which compounds the engagement problem.
📅 CADENCE
Only 17h logged in 23 weeks since contract start (0.73h/wk). Mike Morgan is the sole contributor (100%). No diversification of touch = single-point-of-failure for the relationship.
✅ ACTION
Your CSM note (3/9) flagged 'need to get in earlier in planning, map deeper with Char and Scott.' That action is still open and now urgent — schedule the Scott meeting this week.
🆕 NEW
📬 OPEN
⏳ Pending
⏸ On Hold
🔍 In Review (ER)
⚠ 7 CRITICAL/HIGH TICKETS OPEN · 7 High · review before customer call
Requester: Rajeev Kumar · Status: Open · Created: 2025-06-25
"1. Unable to deploy the cso publish app to dev slug. I was able to deploy the app to dev training. After completion of the app, I am not able to deploy this through contrail cli. Screenshot attached - image1 2. The extension is not working after updating the workflow status option set in dev slug. r…"
Requester: Rajeev Kumar · Status: Pending · Created: 2025-11-28
"When Item is added to the child assortment, VibeIQ internally aggregates the global assortment with newly added items in child assortment. It looks like this **did not** happen for few style options. Sharing couple of examples below: SO ID: LW3HQUS-079911 Loader file: Load so-20264-100110-20251127-0…"
Requester: Chantal De Spiegelaere · Status: Pending · Created: 2026-04-20
"A user was building a board and there are styles pulling into VibeIQ that is not in lineplan in Anaplan (where we get our lineplan data in Vibe): LU9D72S LU9DPTS LU9DPJS LW9FNPS ![](https://vibeiq7921.zendesk.com/attachments/token/h0udH9xXJmebKWZy9MRq2bdKC/?name=image.png) Based on further internal …"
Requester: Chantal De Spiegelaere · Status: Open · Created: 2026-04-24
"Our users have experienced a series of export to PPT issues: - Border of bounding box too big - overlapping text - need grouping of thumbnail + all text properties underneath - Stickies not exporting correctly - Shapes disappearing upon export"
Requester: Chantal De Spiegelaere · Status: Open · Created: 2026-04-30
"You used to be able to click on an entire frame and have all options within frame selection appear in assortment extension - I believe Vibe released a new feature within the last 2 weeks that now allows users to click anywhere on a frame (as opposed to ONLY the border) to format/manipulate the frame…"
Requester: Chantal De Spiegelaere · Status: Pending · Created: 2026-04-30
"Unable to select a Source Assortment in the drop down when creating a board in SU27. Both in NAM and APAC folders. I do see some assortments for that season in the Hub. Noting that Assortment is not showing up under any folder for SU27, and we can see data loads have happened for SU-27 though. ![](h…"
Requester: Chantal De Spiegelaere · Status: Open · Created: 2026-05-08
"The QA org has been recently updated with new configurations and types that are not present in either of the automation orgs. We used the Contrail SDK but have repeatedly gotten internal errors. We require either a tool/wrapper for VibeIQ class in Java that we can use each time QA and the automation…"
Team MemberTaskHoursLast Logged
Mike MorganConfiguration1.5hWed May 06
TOTAL1.5h
Team MemberHours% of totalLast Active
Mike Morgan17h100%Tue May 12
TOTAL17h100%
TaskHours% of totalLast Active
Data / Loads9h53%Wed Jan 14
Configuration8h47%Tue May 12
TOTAL17h100%

Converse 3

CSM: Lauren Faranda-Clasen · converse.com · Billable to Support Contract Jul25-Jul26 ↑ Back to Master
🏥 Health
🟢
Hrs Last Wk
3.5h (→ 0h)
Used
57.33h
Budget
240h
📈 Pace
Under (-54.7%)
🗓 Renewal
Jul 31, 2026 (77d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
Renewal in 78 days with only 23.9% of 240h budget used (Under -54%). 'Budget Concerns' health reason on file. The unused hours are a renewal liability — finance will see 'paid for 240h, used 57h.'
📊 PATTERN
All 3 High tickets (#4070, #4167, #4274) involve data load or dynamic-text/attribute mapping — the team is hitting the same wall repeatedly. Worth a 30-min config working session to address all three together.
✨ OPPORTUNITY
$50K+ in unused support hours could be repositioned as a value-add service (custom dashboards, AI plug-in pilot) before renewal. Frame the under-utilization as 'unused capacity' rather than 'overpaid.'
✅ ACTION
Your notes mention KBO + QBR are next steps post-RIF — get the KBO calendar invite out this week. The renewal-decision window closes in <90 days.
🆕 NEW
0
📬 OPEN
⏳ Pending
⏸ On Hold
🔍 In Review (ER)
⚠ 3 CRITICAL/HIGH TICKETS OPEN · 3 High · review before customer call
Requester: Sanjay Rai · Status: Open · Created: 2026-04-08
"Hi, For new Season data load is failing with error: “No assortment found with identifier: FallHoliday_2026:Footware. Skipping file: FallHoliday_2026.csv” This is for new SOS season created on staging environment and I created another ticket earlier to enable integration for new seasons: https://supp…"
Requester: Sanjay Rai · Status: Pending · Created: 2026-04-23
"Hi, New attribute “Material” with key (cspMaterial) is created at Item level and this attribute value will be updated through data load file. This attribute need to be added in mapping file to load value in VibeIQ. Thanks, Sanjay Rai"
Requester: Caroline Linnehan · Status: Open · Created: 2026-05-12
"I am setting up templates using dynamic text and it is not working for all styles even if the attribute has a value. An example for design pack and model description. Can you look at my board and let me know what we are doing wrong? See board examples: https://boards.vibeiq.com/org/converse-prod/boa…"
Team MemberTaskHoursLast Logged
Prashant PawarData / Loads2.5hTue May 05
Prashant PawarGeneral Meetings1hWed May 06
TOTAL3.5h
Team MemberHours% of totalLast Active
Rakesh Raj12.5h22%Wed Nov 05
Ricardo Sisco8.5h15%Mon Jan 12
Prashant Pawar8h14%Wed May 06
Ashutosh Mulki7.5h13%Wed Mar 18
Raghavendra V6h10%Mon Jan 26
Katy Mullis3.5h6%Tue Jan 20
Nicole Jepeal3.5h6%Tue Oct 07
Kartiki Sahu3h5%Mon Apr 27
Laura Pereira2h3%Tue Nov 04
Melba Deena Lewis1.8h3%Mon Jan 19
Hannah Casey1h2%Wed Apr 22
TOTAL57.3h100%
TaskHours% of totalLast Active
Customizations19.5h34%Fri Mar 27
Data / Loads14h24%Tue May 05
Configuration7h12%Mon Apr 27
Product Support6h10%Mon Jan 26
General Meetings4.5h8%Wed May 06
Integrations3.8h7%Mon Apr 27
Account Management2.5h4%Tue Jan 20
TOTAL57.3h100%

The Gap, Inc. 3

CSM: Lauren Faranda-Clasen · gapinc.com · Billable to SOW - Implementation 2025.11.22-2026.01.31 ↑ Back to Master
🏥 Health
Hrs Last Wk
75h (▲ 2.6h)
Used
$488.5K
Budget
$713.9K
📈 Pace
Under (-31.6%)
🗓 Renewal
Oct 15, 2028 (884d)
AIInsights for the Week · Sonnet 4.6
📊 PATTERN
All 3 High tickets (#3873, #4130, #4269) describe board performance / UX state issues (slow load, copy-paste failure, viewport state). Bundle for engineering as a shared root cause investigation — looks like board rendering layer.
📅 CADENCE
Hours steady at 74h/wk over 24 weeks ($488K of $714K SOW used, 68%) — implementation is humming. Top contributors Lorna (725h, 40%) and Ricardo (627h, 35%) are the institutional knowledge — risky if either rolls off.
✅ ACTION
Recent go-live noted (CSM note says 'recently live'). Health field is still 'Unknown' in HubSpot — update post-go-live for accurate at-risk tracking.
✨ OPPORTUNITY
Renewal is 885 days out (Oct 2028) — far horizon, but Gap is Tier 1 with 166 active / 775 licensed users. Plenty of room for adoption-driven expansion conversations.
🆕 NEW
0
📬 OPEN
⏳ Pending
⏸ On Hold
🔍 In Review (ER)
0
⚠ 3 CRITICAL/HIGH TICKETS OPEN · 3 High · review before customer call
Requester: Omkar Jindam · Status: Open · Created: 2026-02-06
"Users are experiencing multiple inconsistent copy/paste issues within VibeIQ. The behavior varies and occurs intermittently, making it difficult to reproduce on demand. Reported problems include: - Copy/Paste totally unresponsive- when working on a single Board - Copy/Paste is copying over old image…"
Requester: Omkar Jindam · Status: Pending · Created: 2026-04-16
"Reported time: 1:46 PM PST, April 16, 2026 User: Lee Wiens Brand: ON Function: Merch It was reported that boards are taking a really long time to load in general. As an example, the FA26 board specifically is taking over one minute to fully load. I tested the same board on my end and observed simila…"
Requester: Omkar Jindam · Status: Open · Created: 2026-05-11
"Reporting time: 2:24 PM PST, May 8, 2026 User: Erica Worrall (GO NB) OS: Mac Browser: Chrome Location: Remote She reported that when she refreshed her board, the board did not return her to the section she was working in. Instead, it jumped her to a previous location on the board - specifically the …"
Team MemberTaskHoursLast Logged
Ricardo SiscoGeneral Meetings27.5hFri May 08
Lorna CurtisGeneral Meetings  - SA/TA15.5hFri May 08
Lorna CurtisOther15hFri May 08
Ricardo SiscoOther6hFri May 08
Melba Deena LewisOther4hFri May 08
Prashant PawarCustomizations4hFri May 08
Lorna CurtisConfiguration  - SA/TA1.5hMon May 04
Prashant PawarIntegration Build and Test  - SA/TA1hMon May 04
Quach HaiGeneral Meetings  - Sr. SA/TA0.5hWed May 06
TOTAL75h
Team MemberHours% of totalLast Active
Lorna Curtis725.7h40%Wed May 13
Ricardo Sisco627h35%Fri May 08
Shri Halyal200.5h11%Thu Mar 12
Adam Bechtold95h5%Tue Feb 03
Melba Deena Lewis65.9h4%Fri May 08
Quach Hai42.5h2%Wed May 06
Prashant Pawar14.5h1%Fri May 08
Rakesh Raj10.5h1%Wed Apr 29
Zach Sibert10.5h1%Tue Dec 09
Ashutosh Mulki7.5h0%Fri Mar 20
Bailey Heckel5h0%Fri Mar 20
Kartiki Sahu3h0%Tue Apr 28
TOTAL1807.6h100%
TaskHours% of totalLast Active
Other433.8h24%Wed May 13
General Meetings316.3h17%Fri May 08
General Meetings  - SA/TA313.2h17%Wed May 13
Customizations227.7h13%Fri May 08
Account Management176.5h10%Fri Mar 20
Configuration102.7h6%Wed Apr 29
Integration Build and Test  - Sr. SA/TA58h3%Fri Jan 09
General Meetings  - Sr. SA/TA45h2%Wed May 06
Data Load - IC39.3h2%Thu Mar 12
Solution Approach Design  - Sr. SA/TA30h2%Tue Feb 03
Discovery  - SA/TA21.2h1%Tue Apr 14
Integration Build and Test  - SA/TA12h1%Mon May 04
Integration Discovery  - SA/TA6h0%Fri Mar 27
Configuration - IC6h0%Wed Jan 07
Production Readiness  - Sr. SA/TA5h0%Fri Dec 05
User Training3.5h0%Fri Apr 10
Configuration  - SA/TA2.5h0%Mon May 04
Configuration  - Sr. SA/TA2.5h0%Thu Dec 11
Integration Design  - SA/TA1.5h0%Fri Jan 09
Data Load - SA1.5h0%Mon Jan 05
Integration Planning1.5h0%Mon Nov 24
Integration Build and Test - Implementation Consultant1h0%Wed Feb 18
Integration Design  - Sr. SA/TA1h0%Mon Dec 22
TOTAL1807.6h100%

Veronica Beard 20

CSM: Lauren Faranda-Clasen · veronicabeard.com · Billable to Support Contract Nov25-Nov26 ↑ Back to Master
🏥 Health
🟡
Hrs Last Wk
0h
Used
64.09h
Budget
60h
📈 Pace
Burning Fast (+59.3%)
🗓 Renewal
Nov 21, 2026 (190d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
🚨 ENTERPRISE DOWN ticket #4286 opened today (SSO login failure). This is your top priority — confirm someone is engaged. Customer is At Risk + already over budget — an EntDown without immediate response will be the renewal-killing moment.
🔥 RISK
20 Critical/High tickets open + 0 hours logged last week + 0 hours prev week. The customer is in crisis and the support team isn't visible. CSM note explicitly says 'if had to renew today, unsure of value.' This account needs leadership escalation, not weekly check-ins.
📊 PATTERN
All 4 Critical tickets (excluding EntDown) center on publish failures and data integrity (#3970 duplicate item families, #3993 plan publish, #3995 design name validation, #4194 publish failure). Suggests a deeper data-model issue in Veronica Beard's tenant — escalate as systemic, not as 4 separate tickets.
📅 CADENCE
Over budget (107% of 60h) at week 24/52 = burning at 2.4x sustainable pace. Combined with the 0h last week, suggests Hannah Casey (64% of all hours) may be the only one engaged — and she hasn't logged time in 8 weeks.
✅ ACTION
Reactive ticket work won't save this renewal (Nov 2026). Schedule a value-recovery exec meeting THIS week with Lauren + Quach + VB leadership — frame around the 'value realizing exercise' VB is doing internally.
🆕 NEW
📬 OPEN
⏳ Pending
⏸ On Hold
🔍 In Review (ER)
⚠ 20 CRITICAL/HIGH TICKETS OPEN · 1 Enterprise Down · 4 Critical · 15 High · review before customer call
Requester: Molly Monarchio · Status: New · Created: 2026-05-14
"https://api.vibeiq.com/prod/api/sso-login/login/veronicabeard.com?relayState=https%3A%2F%2Fboards.vibeiq.com%2Forg%2Fveronica-beard-prod%2Fboard%2FAyPHAipCW7jEE0lk ![](https://vibeiq7921.zendesk.com/attachments/token/UKow7Nu3ZfVrMqk9wNQ88ojVl/?name=image.png)"
Requester: Molly Monarchio · Status: Pending · Created: 2026-03-09
"Hi Team - Today on a call, while working with a user, we discovered two Item Families that share all the same ITEM DEFINING PROPERTIES. This is very concerning.. how did this happen? I thought we had system rules set up to prevent duplicative data like this from being created. Please help to review …"
Requester: Molly Monarchio · Status: Open · Created: 2026-03-17
"All users (myself included) are experiencing issues for publishing this plan (https://plan.vibeiq.com/org/veronica-beard-prod/plan/zJm8BqyYvrECyMPe) thus preventing us from creating/ updating designs in PLM and downstream systems"
Requester: Molly Monarchio · Status: Pending · Created: 2026-03-18
"**Plan / Reference:** 26FA Plan – Item Family **74662** https://plan.vibeiq.com/org/veronica-beard-prod/plan/b9RF2tp5j-6Vj-h2 **Description:** We are reporting two related system issues impacting Design creation and updates in PLM. Both appear to be malfunctioning and are resulting in **silent (unre…"
Requester: Molly Monarchio · Status: Open · Created: 2026-04-28
"**TLDR** Data inconsistency in VibeIQ plan is causing publish failure. Root issue appears to be an invalid second item option and a mismatch between option ID and displayed name. User confirmed desired state: **keep “STRIKE OUT”, remove “LUCKY STRIKE.”** **Ticket Title** Publish Failure – Invalid It…"
Requester: Molly Monarchio · Status: Pending · Created: 2025-09-03
"**CONTEXT:** As reviewed with Katy on 8/26, there is a discrepancy between the Plan App and Board App, and how the property "Thumbnail" behaves across the two. In PLAN APP, if no Primary Image exists at the OPTION LEVEL then the Primary Image from the Family level populates in "thumbnail" cell as a …"
Requester: Molly Monarchio · Status: Open · Created: 2025-09-24
"Hi Team - Can you please help to look into the Board's share link? While in a board, and w click "Share > Copy Link," the copied link results in a error message: ![](https://vibeiq7921.zendesk.com/attachments/token/0WglOx4wGQgaUdtjLW9KnkaZi/?name=mceclip0.png) E.g. While in this board, I followed ab…"
Requester: Molly Monarchio · Status: Open · Created: 2025-09-24
"Hi Team - Please help to provide a general outline of how we can utilize the annottae feature accross our system Please also advise expected system behavior in relatiton to this feature. If not, please advise est. hours required to build 1x new annotate sticker. Please advise if I can create custom …"
Requester: Molly Monarchio · Status: Open · Created: 2025-09-25
"Hi Team - I am writing to inquire about expected system functionality for BOARDS: History > Source Change History. Can you explain what this is showing? (history of item family/options add/ removed/ updated on this board?) In below example, it is showing that this item changed multiple times, but th…"
Requester: Molly Monarchio · Status: Pending · Created: 2025-11-14
"Hi Team - Please help to advise the est. hours to add in a new property at the Project Item Family level (for products) that pulls in the option selected in the "Item: Material > Property: Partner (Material)" that is assocaited at the "Design Main Material" E.g. In below example we would want the op…"
Requester: Molly Monarchio · Status: Pending · Created: 2025-12-11
"Jumping off of conversation ignited on ticket# 3532, across all material & product options, when the color name is removed from the option, the item option name does not regenerate or clear. Instead, it keeps the name of the color that is no longer assigned to the option. If the intent of having the…"
Requester: Molly Monarchio · Status: Pending · Created: 2026-01-14
"Hi Team - When data set is adjusted on a custom entity (e.g. Body No.) we do not always have the visibilty to see which user made this change. As an example, please look at Item 78750: ![](https://vibeiq7921.zendesk.com/attachments/token/OBI2wZmMe7NI6xIE9eqZ1xcWl/?name=mceclip0.png) On 1/06 we can s…"
Requester: Molly Monarchio · Status: Pending · Created: 2026-01-20
"Hi Team - I am curious if it is possible to deploy a system rule so that "Once a item option with an associated color name has been published on a plan, the associated color name cannot be removed from the item option." This is to help maintain clean 1:1 relationships between our systems. Please hel…"
Requester: Molly Monarchio · Status: Pending · Created: 2026-01-23
"Customization Inquiry | Custom Line Board to depict Item Family Primary Image + Option Associated Color Name Primary Image We have identified a major opportunity to gain efficiencies across the design team. Ultimately, we are trying to r4ender a solution that allows the merch team to generate line s…"
Requester: Molly Monarchio · Status: Open · Created: 2026-02-13
"Hi VibeIQ Team, I’m opening a ticket to report an issue with the pivot-related feature enhancement that was rolled out on **January 29**. Based on our testing, the functionality is not behaving as described in the release notes. **Example** Please reference style **J26FA0198** on the plan linked bel…"
Requester: Molly Monarchio · Status: Open · Created: 2026-03-03
"Hi Team, (cc'ing Hannah directly as I am hopeful she will be able to help resolve.) We’ve identified a data integrity issue impacting the **26FA Plan**: https://plan.vibeiq.com/org/veronica-beard-prod/plan/zJm8BqyYvrECyMPe **Item Family:** ITEM-89411 **Specific Body No.:** ID 110001 ### Issue Descri…"
Requester: Molly Monarchio · Status: Pending · Created: 2026-03-04
"When using the **“Regenerate All Line Boards”** action on the board, all **Line Board views unexpectedly switch item‑family level**. This behavior occurs immediately after regeneration and requires manual correction to return to multi‑level view. **Expected Behavior:** Regenerating lineboards should…"
Requester: Molly Monarchio · Status: Open · Created: 2026-03-05
"**Subject:** Error When Creating New Fabric/Yarn Family Options – “An entity with the same name already exists” **Priority:** High (Blocking configuration work) **Description:** We are encountering a system error when attempting to set up new **Fabric/Yarn Family** options in Vibe IQ. The error mess…"
Requester: Molly Monarchio · Status: Open · Created: 2026-03-06
"**Description** This ticket is being reopened as a **critical follow‑up** to formally document a major system capability gap that continues to impact our teams and the shared user experience goals we are collectively working toward. Currently, users **cannot filter the Item Library by object referen…"
Requester: Molly Monarchio · Status: Pending · Created: 2026-05-01
"Hi Team, During the initial setup in VibeIQ, the properties “Stitch,” “Gauge,” and “Ends” were configured as single-select fields. In our prior PLM workflow, these option sets were maintained directly by designated business users, which allowed them to scale efficiently as new values were introduced…"
No hours logged last week.
Team MemberHours% of totalLast Active
Hannah Casey41h64%Fri Mar 06
Rakesh Raj10.7h17%Tue Mar 03
Melba Deena Lewis6.7h10%Fri Mar 20
Katy Mullis3.5h5%Wed Mar 18
Prashant Pawar2.2h4%Fri Mar 06
TOTAL64.1h100%
TaskHours% of totalLast Active
Configuration52.2h81%Fri Mar 20
Customizations8.9h14%Thu Feb 19
Data / Loads2h3%Fri Mar 06
General Meetings1h2%Fri Mar 06
TOTAL64.1h100%

Agron

CSM: Oriana Coburn · agron.com · Billable to Support Contract May26-May27 ↑ Back to Master
🏥 Health
🟡
Hrs Last Wk
5.5h (▲ 5.5h)
Used
5.5h
Budget
120h
📈 Pace
On Track (+2.1%)
🗓 Renewal
May 05, 2028 (721d)
AIInsights for the Week · Sonnet 4.6
✨ OPPORTUNITY
CSM notes call out 'over-utilizing Plan app' on old pricing. Direct upsell signal — bundle with positive momentum (Jeff pleased with Showcase prioritization) for a pricing conversation.
📅 CADENCE
New support contract started 1.3 weeks ago — 5.5h already logged (Kartiki, integrations). Establishing baseline; check back in 4 weeks to confirm sustainable pace before budget concerns surface.
✅ ACTION
Health is 'At Risk' but reason field is blank in HubSpot. Update with current rationale or downgrade to Healthy if the new process for sales reps + Showcase parity work is resolving prior concerns.
🆕 NEW
0
📬 OPEN
⏳ Pending
0
⏸ On Hold
🔍 In Review (ER)
Team MemberTaskHoursLast Logged
Kartiki SahuIntegrations5.5hThu May 07
TOTAL5.5h
Team MemberHours% of totalLast Active
Kartiki Sahu5.5h100%Thu May 07
TOTAL5.5h100%
TaskHours% of totalLast Active
Integrations5.5h100%Thu May 07
TOTAL5.5h100%

Alo Yoga 8

CSM: Oriana Coburn · aloyoga.com · Billable to Support Contract Apr26-Apr27 ↑ Back to Master
🏥 Health
🟡
Hrs Last Wk
2h (▲ 2h)
Used
2.5h
Budget
120h
📈 Pace
Under (-8.1%)
🗓 Renewal
Apr 06, 2027 (326d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
2 new Critical tickets this week (#4252 item options clearing, #4250 platform slowness). Tier 1 customer with At Risk health — a Critical-ticket spike during the same week the customer is 'considering 20 more seats' is the worst possible timing.
📊 PATTERN
4 of 8 Critical/High tickets (#4252, #3888, #4067, #3709) describe data/UI state clearing or disappearing. Possible UI persistence or auto-save bug — flag to engineering as a cluster.
📅 CADENCE
Only 2.5h used of 120h budget across 5 weeks (0.47h/wk avg). For a Tier 1 customer flagged with 'Lack of strategic engagement,' this is a usage-confidence gap, not an over-budget concern.
✨ OPPORTUNITY
Per notes, 20-seat expansion is being scoped. Don't let the ticket backlog torpedo the upsell — get the 2 new Criticals resolved this week before the seat conversation continues.
🆕 NEW
0
📬 OPEN
⏳ Pending
⏸ On Hold
🔍 In Review (ER)
⚠ 8 CRITICAL/HIGH TICKETS OPEN · 2 Critical · 6 High · review before customer call
Requester: Haley Howarth · Status: Open · Created: 2026-05-07
"I noticed item options were missing from the plan today. I went in and updated all of them and then when I rechecked item option is empty a bunch populated again. When I try to promote so they add the option back it starts to remove some data specifically the color status which is important data we …"
Requester: Claire Sexton · Status: Pending · Created: 2026-05-07
"Hi, We are rushing towards a deadline and the platform has been moving unusually slow. Can someone please look into this to correct as soon as possible?"
Requester: Izzy Levi · Status: Pending · Created: 2025-12-16
"trying to run lineboards using templates and pulling / organizing it completely wrong and also showing "n/", also not showing the full delivery name / field text"
Requester: Marjolyn Megaloudis · Status: Open · Created: 2025-12-16
"On December 12th we discovered one of our color statuses reading as "dropped." Upon going into the item modal the history displayed the color status going from dropped - new on that day. When reviewing the version history, the color status was reading as 'new' from 11/7 - 12/12. We are concerned the…"
Requester: Izzy Levi · Status: Open · Created: 2026-02-10
"Haley had a large amount of style statuses clear out all at once at 5:49 PM. Here the list: you won't be able to see the blanks because we have to urgently fill them in for the morning. W54582R_AR01 W4865R_AR01 W4865R_AR03299 W4865R_AR04570 W4833R_AR01 W4833R_AR03299 W4833R_AR03842 W4833R_AR05594 W4…"
Requester: Izzy Levi · Status: Pending · Created: 2026-04-07
"text box is disappearing please see attached videos"
Requester: Marjolyn Megaloudis · Status: Pending · Created: 2026-04-20
"There is currently a bug in the Item Library Chooser when selecting from Boards or Line Plans where the “Created On” filter is not functioning. Although the filter option is visible, it is not feeding from any data source, causing the selection options to appear blank. This filter is needed to bulk‑…"
Requester: Antonio Martel · Status: Pending · Created: 2026-05-08
"We have a process in PLM that attaches/uploads assets to ItemOptions (.AI files in this case) This is done with API calls. Consider the next base API calls: Step1_APIFiles (POST):https://api.vibeiq.com/prod/api/files Step2_UploadToS3Bucket (POST):https://s3.amazonaws.com/prod-contrail-file-content-b…"
Team MemberTaskHoursLast Logged
Kartiki SahuIntegrations2hFri May 08
TOTAL2h
Team MemberHours% of totalLast Active
Kartiki Sahu2h80%Fri May 08
Hannah Casey0.2h10%Sat Apr 25
Katy Mullis0.2h10%Wed Apr 22
TOTAL2.5h100%
TaskHours% of totalLast Active
Integrations2h80%Fri May 08
Configuration0.5h20%Sat Apr 25
TOTAL2.5h100%

Huckberry

CSM: Oriana Coburn · huckberry.com · Billable to Support Contract Dec25-Dec26 ↑ Back to Master
🏥 Health
🔴
Hrs Last Wk
0h
Used
0h
Budget
30h
📈 Pace
Under (-36.8%)
🗓 Renewal
Dec 30, 2026 (229d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
Critical health + 0 hours ever logged + 230 days to renewal. Complete adoption failure. The discovery call this Thursday with Kelly + Merch team is your last realistic intervention window.
✅ ACTION
If Thursday's discovery call doesn't produce a clear use-case path forward, escalate to leadership to discuss the renewal posture (renew + invest in re-implementation vs. churn at renewal).
📊 PATTERN
0 Zendesk tickets, 0 hours, 0 budget consumed — customer is effectively dormant. There's no negative signal because there's no signal at all. The Thursday call needs to surface concrete tooling pain Vibe could solve.
🆕 NEW
0
📬 OPEN
0
⏳ Pending
0
⏸ On Hold
0
🔍 In Review (ER)
0
No hours logged last week.
No time entries yet.
No time entries yet.

KNS International

CSM: Oriana Coburn · knsint.com · Billable to Support Contract - Journee Jan26-Jan27 ↑ Back to Master
🏥 Health
🟢
Hrs Last Wk
0h
Used
4.17h
Budget
60h
📈 Pace
Under (-22.4%)
🗓 Renewal
Jan 26, 2027 (256d)
AIInsights for the Week · Sonnet 4.6
✨ OPPORTUNITY
New designer starting in April per CSM notes — perfect proactive onboarding moment. Reach out to Kelsey week of arrival with a tailored 30-min walkthrough; turns a passive license into engaged usage.
📅 CADENCE
4.17h logged in 15 weeks (0.27h/wk avg). Internal turnover is reported but not bleeding the contract. Healthy status is appropriate — keep proactive cadence light.
✅ ACTION
VP of Merch was trained recently — schedule a 4-week check-in to verify adoption stuck and surface any blockers Kelsey hasn't yet escalated.
🆕 NEW
0
📬 OPEN
0
⏳ Pending
⏸ On Hold
0
🔍 In Review (ER)
0
No hours logged last week.
Team MemberHours% of totalLast Active
Oriana Coburn3h71%Thu Mar 19
Melba Deena Lewis0.7h16%Fri Jan 30
Prashant Pawar0.5h12%Tue Feb 17
TOTAL4.2h100%
TaskHours% of totalLast Active
Configuration2.2h52%Tue Feb 17
Account Management2h48%Thu Mar 19
TOTAL4.2h100%

Kizik

CSM: Oriana Coburn · kizik.com · Billable to Support Contract Jun25-Jun26 ↑ Back to Master
🏥 Health
🟢
Hrs Last Wk
0.9h (▼ 4.1h)
Used
51.85h
Budget
50h
📈 Pace
Ahead (+10.3%)
🗓 Renewal
Jun 05, 2026 (21d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
🚨 Renewal in 22 DAYS (most urgent on the docket). Currently 103.7% of budget, Ahead pace — good signal but renewal is the gate to everything else. Get the contract executed before any upsell conversation continues.
✨ OPPORTUNITY
Documented upsell paths in your notes: $23.6K or $37K via Full + V/C license expansion. Heather increasing config requests = growing trust signal. Lead with renewal, follow with upsell once signed.
📅 CADENCE
Hours dropped from 5h → 0.9h week-over-week — likely natural slowdown as the renewal/upsell conversation takes precedence over support work. Not alarming, but worth a final 30-min config sweep before the renewal close.
🆕 NEW
0
📬 OPEN
⏳ Pending
⏸ On Hold
0
🔍 In Review (ER)
Team MemberTaskHoursLast Logged
Oriana CoburnConfiguration0.8hSun May 10
Melissa SerranoConfiguration0.2hFri May 08
TOTAL1h
Team MemberHours% of totalLast Active
Melba Deena Lewis9.8h19%Mon Apr 06
Oriana Coburn9.8h19%Sun May 10
Rakesh Raj9.3h18%Tue Apr 28
Ashutosh Mulki4.5h9%Wed Apr 08
Prashant Pawar4.5h9%Thu Jan 22
Nicole Jepeal3.5h7%Thu Oct 02
Zach Sibert3.2h6%Mon Nov 17
Hannah Casey3h6%Fri Mar 06
Melissa Serrano2.2h4%Fri May 08
Ricardo Sisco2h4%Mon Jun 09
TOTAL51.9h100%
TaskHours% of totalLast Active
Configuration26.6h51%Sun May 10
Product Support14.2h27%Wed Apr 08
Data / Loads3.5h7%Tue Apr 28
Account Management3.5h7%Wed Nov 19
General Meetings2.5h5%Wed Nov 05
Integrations1.5h3%Wed Jan 28
TOTAL51.9h100%

L.L.Bean

CSM: Oriana Coburn · llbean.com · Billable to Support Contract Feb26-Feb27 ↑ Back to Master
🏥 Health
🟢
Hrs Last Wk
0h
Used
0h
Budget
60h
📈 Pace
Under (-24.7%)
🗓 Renewal
Feb 12, 2027 (273d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
$100K AI strategy / expansion now 'unlikely' per your notes — that revenue is moving off the forecast. 0h of 60h support contract used in 13 weeks since start = no engagement to leverage in expansion conversation.
✅ ACTION
Brian presenting Chapter 2 AI strategy to exec team — get on his calendar before that presentation to position VibeIQ within the broader story. If Vibe shows up as 'one of several tools under review,' the budget allocation gets sliced thin.
📅 CADENCE
Zero hours after 13 weeks is a yellow flag for a Tier 1 customer. Implementation/onboarding has not started in earnest. Right now, low usage is OK; in 8 more weeks, it's a problem.
🆕 NEW
0
📬 OPEN
0
⏳ Pending
0
⏸ On Hold
🔍 In Review (ER)
No hours logged last week.
No time entries yet.
No time entries yet.

Malbon Golf

CSM: Oriana Coburn · malbongolf.com · Billable to Support Contract Jul25-Jul26 ↑ Back to Master
🏥 Health
🟡
Hrs Last Wk
0h (→ 0.1h)
Used
9.79h
Budget
60h
📈 Pace
Under (-62.5%)
🗓 Renewal
Jul 30, 2027 (441d)
AIInsights for the Week · Sonnet 4.6
📊 PATTERN
6 of 8 unresolved tickets are 'In Review (ER)' — engineering backlog is the bottleneck, not Vibe support. CSM notes flagged Showcase + Plan slowness frustrations communicated to Dan; track product team's response timeline.
✨ OPPORTUNITY
Participating in AI plug-in beta per notes. Capture their feedback systematically — this is a credibility-building moment that can offset 'frustrations out of implementation.'
📅 CADENCE
9.8h used of 60h in 41 weeks (Under -62.5%). Pattern of low-intensity engagement is sustainable for renewal but won't justify expansion. No fire to put out this week.
🆕 NEW
0
📬 OPEN
⏳ Pending
⏸ On Hold
0
🔍 In Review (ER)
No hours logged last week.
Team MemberHours% of totalLast Active
Melba Deena Lewis4.2h43%Wed Mar 25
Oriana Coburn1.5h15%Sun Mar 22
Rakesh Raj1.5h15%Thu Nov 27
Melissa Serrano1.4h14%Tue Apr 28
Hannah Casey1.2h13%Tue Feb 10
TOTAL9.8h100%
TaskHours% of totalLast Active
Configuration4.4h45%Tue Apr 28
Product Support4.2h43%Wed Mar 25
Account Management1.2h13%Tue Feb 10
TOTAL9.8h100%

Mission

CSM: Oriana Coburn · mission.com · Billable to Support Contract Nov25-Oct26 ↑ Back to Master
🏥 Health
🟢
Hrs Last Wk
1.7h (▲ 1.7h)
Used
22.19h
Budget
30h
📈 Pace
Burning Fast (+20.7%)
🗓 Renewal
Oct 31, 2026 (169d)
AIInsights for the Week · Sonnet 4.6
📅 CADENCE
Hours spiked 1.7h this week (vs 0.8h avg) — first activity since project start. Ashutosh historically dominant (54%, last activity Feb 26); recent shift to Melba (3.2h, last May 6) suggests resource handoff. Verify intentional.
🔥 RISK
74% of 30h budget used at 53% time elapsed (Burning Fast +21%). Will exhaust ~3 weeks before contract end (Oct 31). Worth raising the budget conversation soon, not at month 10.
✅ ACTION
No CSM notes on file. With 2 open tickets and accelerating burn, a 15-min check-in is warranted to confirm health is genuinely 'Healthy' and not just unscored.
🆕 NEW
0
📬 OPEN
⏳ Pending
0
⏸ On Hold
0
🔍 In Review (ER)
0
Team MemberTaskHoursLast Logged
Melba Deena LewisProduct Support1.5hWed May 06
Melissa SerranoConfiguration0.2hFri May 08
TOTAL1.7h
Team MemberHours% of totalLast Active
Ashutosh Mulki12h54%Thu Feb 26
Melba Deena Lewis3.2h14%Wed May 06
Oriana Coburn3h14%Fri Mar 20
Melissa Serrano1.5h7%Fri May 08
Prashant Pawar1.5h7%Thu Apr 09
Laura Pereira1h5%Thu Jan 15
TOTAL22.2h100%
TaskHours% of totalLast Active
Configuration16.8h76%Fri May 08
Product Support4.2h19%Wed May 06
Account Management1.2h6%Fri Dec 19
TOTAL22.2h100%

Rifle Paper

CSM: Oriana Coburn · riflepaperco.com · Billable to Support Contract Jun25-Jun26 ↑ Back to Master
🏥 Health
🟢
Hrs Last Wk
3.2h (▲ 0.7h)
Used
32.79h
Budget
60h
📈 Pace
Under (-35.5%)
🗓 Renewal
Jun 20, 2027 (401d)
AIInsights for the Week · Sonnet 4.6
✅ ACTION
KBO scheduled for May per your notes — confirm the date is on the calendar this week. Emily + Rachel happy with partnership = use the KBO to anchor the upsell conversations Haley is pursuing (creative team + sales team).
✨ OPPORTUNITY
Active users (39) significantly exceed licensed (10) — compliance check + upsell opportunity. Same dynamic as Kizik. Time the seat conversation with KBO momentum.
📅 CADENCE
3.2h last week (up 0.7h WoW) — steady, intentional usage. Rakesh + Oriana split top contributor positions evenly. No red flags.
🆕 NEW
0
📬 OPEN
⏳ Pending
0
⏸ On Hold
🔍 In Review (ER)
Team MemberTaskHoursLast Logged
Rakesh RajConfiguration2.8hThu May 07
Oriana CoburnConfiguration0.5hMon May 04
TOTAL3.3h
Team MemberHours% of totalLast Active
Rakesh Raj11.3h35%Thu May 07
Oriana Coburn8.8h27%Mon May 04
Melissa Serrano4.7h14%Thu Apr 16
Melba Deena Lewis4h12%Wed Apr 08
Prashant Pawar3h9%Mon Apr 06
Quach Hai0.5h2%Fri Apr 03
Laura Pereira0.5h2%Thu Jan 15
TOTAL32.8h100%
TaskHours% of totalLast Active
Configuration28.8h88%Thu May 07
Data / Loads4h12%Tue Feb 17
TOTAL32.8h100%

Spanx

CSM: Oriana Coburn · spanx.com · Billable to Support Contract Feb26-Feb27 ↑ Back to Master
🏥 Health
🟡
Hrs Last Wk
0h
Used
28.01h
Budget
120h
📈 Pace
On Track (-3.2%)
🗓 Renewal
Feb 06, 2027 (267d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
Champion Left + Low Usage are both on the health record + 268d to renewal. Champion loss in CS data is highly correlated with churn — get to Sarat in Quach's upcoming call with clear ROI narrative.
✨ OPPORTUNITY
Spanx asked for a sell-in demo for their sales team (scheduled with Pam 4/2 per notes) — that's a champion-rebuilding moment. Follow up to confirm the demo landed and identify the new advocate.
📅 CADENCE
0h last week, 0h prev week, 2.01h weekly avg. Engagement was light even before champion loss; rebuilding momentum requires both adoption help AND surfacing measurable wins.
🆕 NEW
📬 OPEN
0
⏳ Pending
0
⏸ On Hold
0
🔍 In Review (ER)
No hours logged last week.
Team MemberHours% of totalLast Active
Ashutosh Mulki8.5h30%Mon Mar 23
Raghavendra V8.5h30%Thu Feb 26
Rakesh Raj6.5h23%Mon Apr 06
Prashant Pawar4.5h16%Thu Feb 12
Melissa Serrano0h0%Thu Apr 09
TOTAL28h100%
TaskHours% of totalLast Active
Configuration15h54%Thu Apr 09
Integrations8.5h30%Thu Feb 26
Product Support4.5h16%Thu Feb 12
TOTAL28h100%

Stuart Peters

CSM: Oriana Coburn · speters.co.uk · Billable to Support Contract Dec25-Dec26 ↑ Back to Master
🏥 Health
🟡
Hrs Last Wk
0h
Used
9.5h
Budget
30h
📈 Pace
Under (-10.6%)
🗓 Renewal
Dec 10, 2028 (940d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
75 licenses purchased, ~35 actively used (per your notes). That gap is a 'no clear path to 75' problem at renewal time, even though renewal is 941 days out — write the adoption play now.
📅 CADENCE
0h last week, 0h prev — but onsite was 'early April after PI Apparel.' Time entries should have shown up by now. If Melba (100% of historical hours, last Feb 9) hasn't logged anything from the onsite, something didn't get tracked.
✨ OPPORTUNITY
Participating in AI plug-in beta — same pattern as Malbon. Capture feedback as a product credit; use any wins to rebuild adoption momentum.
🆕 NEW
0
📬 OPEN
0
⏳ Pending
0
⏸ On Hold
🔍 In Review (ER)
No hours logged last week.
Team MemberHours% of totalLast Active
Melba Deena Lewis9.5h100%Mon Feb 09
TOTAL9.5h100%
TaskHours% of totalLast Active
Customizations9.5h100%Mon Feb 09
TOTAL9.5h100%

Vera Bradley 1

CSM: Oriana Coburn · verabradley.com · Billable to Support Contract Dec25-Nov26 ↑ Back to Master
🏥 Health
🟡
Hrs Last Wk
0h (→ 0.2h)
Used
47.43h
Budget
60h
📈 Pace
Burning Fast (+34%)
🗓 Renewal
Nov 30, 2027 (564d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
79% of 60h budget at 45% time elapsed (Burning Fast +34%). Pace will exhaust budget ~2 months before contract end (Nov 30). Either re-scope or upsell support hours in the next 4 weeks.
📊 PATTERN
Ticket #3981 (Carryover vendor data loss) opened in March, still pending. Project is 'wrapping up' per notes — make sure this ticket doesn't fall through the cracks during the CSM handoff.
📅 CADENCE
0h last week, 0h prev — but historical hours show even split across 4 team members. Project handoff to CSM is the next milestone per notes; confirm the new CSM has full context on the 7 open tickets.
✅ ACTION
57 active users / 14 licensed = significant overage. Same upsell pattern as Kizik and Rifle Paper — schedule a license-true-up conversation post-handoff.
🆕 NEW
📬 OPEN
0
⏳ Pending
⏸ On Hold
🔍 In Review (ER)
0
⚠ 1 CRITICAL/HIGH TICKET OPEN · 1 High · review before customer call
Requester: Manish Shah · Status: Pending · Created: 2026-03-12
"52232 Beach Towel is one example that was carried over from 2026 to 2027 season. It carries over just 1 vendor vs multiple vendor were attached in previous season."
No hours logged last week.
Team MemberHours% of totalLast Active
Raghavendra V13.5h28%Mon Mar 02
Katy Mullis11.8h25%Mon Apr 27
Prashant Pawar10h21%Tue Jan 06
Ashutosh Mulki8h17%Tue May 12
Rakesh Raj3h6%Mon Mar 02
Melba Deena Lewis1.2h2%Tue Feb 03
Melissa Serrano0h0%Thu Apr 16
TOTAL47.4h100%
TaskHours% of totalLast Active
Integrations19.3h41%Mon Apr 27
Data / Loads15.3h32%Mon Mar 02
Configuration12.8h27%Tue May 12
TOTAL47.4h100%

Xero Shoes

CSM: Oriana Coburn · xeroshoes.com · Billable to Support Contract Oct25-Oct26 ↑ Back to Master
🏥 Health
Hrs Last Wk
0h
Used
3.33h
Budget
30h
📈 Pace
Under (-42.5%)
🗓 Renewal
Oct 31, 2027 (534d)
AIInsights for the Week · Sonnet 4.6
✅ ACTION
Training was scheduled for 2/26–3/5 per notes (now 10 weeks ago). Confirm completion + activate go-live tracking. If training slipped again, this is a project-recovery moment, not a CSM check-in.
📊 PATTERN
Health field is empty in HubSpot — data hygiene gap. Set a value (Healthy or At Risk based on training outcome) to enable accurate cross-customer reporting.
📅 CADENCE
3.3h logged total, all from Rakesh in December. No activity since — confirms post-implementation customer is dormant. Single Open ticket suggests light engagement, not churn risk yet.
🆕 NEW
0
📬 OPEN
⏳ Pending
0
⏸ On Hold
0
🔍 In Review (ER)
0
No hours logged last week.
Team MemberHours% of totalLast Active
Rakesh Raj3.3h101%Tue Dec 16
TOTAL3.3h100%
TaskHours% of totalLast Active
Configuration3.3h101%Tue Dec 16
TOTAL3.3h100%

Fanatics Inc

CSM: Quach Hai · fanaticsinc.com · Billable to SOW ↑ Back to Master
🏥 Health
Hrs Last Wk
0h
Used
0h
Budget
📈 Pace
🗓 Renewal
Feb 24, 2028 (650d)
AIInsights for the Week · Sonnet 4.6
📅 CADENCE
0h last week vs 25h/wk historical avg — project is fully stalled. CSM notes confirm 'awaiting guidance from Fanatics.' This is a Fanatics-side blocker; Vibe team is correctly disengaged but at risk of being deprioritized.
🔥 RISK
After investing 1,603 hours in discovery + solution design (78% Ceilidh Kane), a stall this long risks the work becoming stale. Re-discovery on restart costs time and momentum.
✅ ACTION
Get a 30-min meeting with the Fanatics champion this month — even if no decision is ready, an active touchpoint prevents Vibe from being sidelined in their tooling roadmap.
🆕 NEW
0
📬 OPEN
0
⏳ Pending
0
⏸ On Hold
0
🔍 In Review (ER)
0
No hours logged last week.
Team MemberHours% of totalLast Active
Ceilidh Kane1251.9h78%Thu Mar 19
Quach Hai231h14%Wed Sep 24
Kamal Kamalaldin63h4%Mon Jul 14
Shri Halyal27.5h2%Thu Sep 11
Brian Lindauer19h1%Sun May 11
Chris Brown8h0%Tue Oct 14
Zach Sibert3h0%Mon Nov 17
TOTAL1603.4h100%
TaskHours% of totalLast Active
Discovery  - SA/TA600.6h37%Mon Feb 23
Solution Approach Design  - SA/TA556.8h35%Wed Mar 18
General Meetings  - SA/TA127.3h8%Thu Mar 19
Discovery  - Sr. SA/TA106h7%Wed Sep 24
General Meetings  - Sr. SA/TA89.2h6%Tue Jul 29
Solution Approach Design  - Sr. SA/TA69.5h4%Fri Mar 06
Other14.5h1%Mon Nov 03
Integration Build and Test  - Sr. SA/TA14h1%Sun May 11
Integration Design  - SA/TA7.3h0%Tue May 27
Integration Build and Test  - SA/TA5.8h0%Mon Jul 07
Account Management3.4h0%Fri Jun 27
Configuration  - Sr. SA/TA3h0%Wed Sep 24
Integration Discovery  - SA/TA3h0%Tue Jul 29
Customizations2h0%Mon Jun 30
Internal Adjustment - Overtime1h0%Tue Oct 14
TOTAL1603.4h100%

Michael Kors 2

CSM: Quach Hai · michaelkors.com · Billable to Support Contract Feb26-Feb27 ↑ Back to Master
🏥 Health
🟡
Hrs Last Wk
0h
Used
11.43h
Budget
156h
📈 Pace
Under (-20.4%)
🗓 Renewal
Feb 01, 2028 (627d)
AIInsights for the Week · Sonnet 4.6
📊 PATTERN
Open High ticket #2881 dates back to June 2025 (11 months old). Either close-out or escalate — stale tickets erode customer trust silently. Same with #4107 (April) on background-removal images.
📅 CADENCE
0h last week + 85% of all-time hours from Katherine alone (Account Management, 9.7h since project start) — engagement is light and primarily relationship-driven. For a Tier 1 customer, this is below the threshold of meaningful CS investment.
✅ ACTION
SOW for retail teams is gated on 'outstanding questions' per notes. Identify the 2-3 specific blockers in writing this week and route them to the right MK stakeholder — don't let this drift past the planned KBO.
✨ OPPORTUNITY
31 licensed / 29 active — clean utilization, well-matched. Healthy floor for an expansion conversation when the retail SOW unblocks.
🆕 NEW
0
📬 OPEN
⏳ Pending
⏸ On Hold
🔍 In Review (ER)
⚠ 2 CRITICAL/HIGH TICKETS OPEN · 2 High · review before customer call
Requester: Shawn Entenman · Status: Open · Created: 2025-06-05
"Hello, The other week we found out that our image workflows weren't running all the way through for a few days. We found out based on an image not being in Vibe that should be there. Request to receive error message if an image workflow does not trigger in the integration when it is supposed to Best…"
Requester: Tara Camisa · Status: Pending · Created: 2026-04-14
"This is a follow-up to your previous request #3668 "urgent - background removal not working for a few skus" I am seeing some more examples where the ‘default’ sku that has the background removed is not set as the default image: ![](https://vibeiq7921.zendesk.com/attachments/token/DacS8ylRkQ8ZiY5CYgt…"
No hours logged last week.
Team MemberHours% of totalLast Active
Katherine Barnes Griess9.7h85%Tue Mar 31
Katy Mullis1.8h15%Thu Feb 19
TOTAL11.4h100%
TaskHours% of totalLast Active
Account Management9.7h85%Tue Mar 31
General Meetings1.8h15%Thu Feb 19
TOTAL11.4h100%

New Balance 11

CSM: Quach Hai · newbalance.com · Billable to Support Contract Apr26-Apr27 ↑ Back to Master
🏥 Health
🟡
Hrs Last Wk
7.6h (▲ 5.8h)
Used
7.57h
Budget
40h
📈 Pace
Ahead (+7.9%)
🗓 Renewal
Apr 20, 2027 (340d)
AIInsights for the Week · Sonnet 4.6
🔥 RISK
1 Critical + 10 High tickets all relating to PLM integration. #4075 (Re-trigger failed entries) is the active Critical. Cluster suggests a fundamental gap in FlexPLM ↔ Vibe sync reliability, not 11 separate issues.
📊 PATTERN
7+ open tickets reference carryover data loss, NRF Color missing in carryovers, composite plan misses, status attribute mismatches — these are all variants of 'data sync between Vibe and PLM is unreliable.' Engineering needs a systemic fix, not piecemeal patches.
📅 CADENCE
Hours spiked 2.5x this week (7.6h vs 3.02h avg), Ashutosh (Data/Loads) leading. Likely driven by Critical #4075 response — confirm this drove the spike, not unrelated work.
✨ OPPORTUNITY
4 org copies requested in coming months per notes — billable services revenue. Grant has the request; make sure the scope/quote gets to the customer before the request goes cold.
✅ ACTION
Upcoming KBO is the venue to discuss the PLM-sync ticket cluster as a single program-level concern, not 11 line items. Prepare a 1-pager that consolidates the pattern.
🆕 NEW
0
📬 OPEN
⏳ Pending
⏸ On Hold
🔍 In Review (ER)
⚠ 11 CRITICAL/HIGH TICKETS OPEN · 1 Critical · 10 High · review before customer call
Requester: Saurabh Bhattacharya · Status: Open · Created: 2026-04-08
"Hi Team, There are a lot of failed FlexPLM workflow entries since today morning around 5:30am EST. There was a patch deployment in Flex side which caused this issue. Flex is restarted now. Can you please help in retriggering the failed entries? Please let me know if you need any additional informati…"
Requester: Saurabh Bhattacharya · Status: Open · Created: 2025-10-01
"Hi Team, Below scenario is reported by Flex team. 1. Item is added to a plan and gets sent to PLM 2. In PLM data is updated at STSL level 3. Same item gets carried over in Vibe to a different project-plan 4. It gets published to PLM where the STSL attributes data gets blanked out 5. IF step 3 and 4 …"
Requester: Oliver Swenson · Status: Open · Created: 2025-12-02
"Hello - its come to our attention that NRF Color does not appear to be populating in Vibe during the carryover uploads, despite the files having NRF Color as an attribute/value. Please use 9.12.25 Footwear upload as an example. Attaching the uploaded file from that instance. Checking those Items in …"
Requester: Oliver Swenson · Status: Pending · Created: 2025-12-10
"Hello - We have instances where our All Merch composite plans are not catching all child plan publishes. Below is an example. Item Number: U20006YL This Item was added to the S1-26 FTW APAC Lifestyle plan and the plan successfully published on Dec. 2. at 8:14 PM via my screenshot. The corresponding …"
Requester: Saurabh Bhattacharya · Status: Pending · Created: 2025-12-12
"Hi Team, We are facing a strange issue in our plans. We had an attribute (Prelim 12 month Forecast) on project-item level, which we decided to move to item family level due to business requirement. We had created a new attribute on item-family with a different key and ran a script to load data from …"
Requester: Oliver Swenson · Status: Open · Created: 2025-12-17
"Hello, We have a persistent issue that has been discussed with you team before. When a PM drops/cancels an Item in Vibe, the Product Status/Item Development Status updates via an Event Workflow. However, those event workflows are not processed immediately. If the plan is then published prior to the …"
Requester: Saurabh Bhattacharya · Status: Pending · Created: 2026-01-22
"Plan : https://plan.vibeiq.com/org/nb-reimagine-prod/plan/Y2M9PjIc5aj8ueGK Item Number: P906037C Item Development Status which is a project-item attribute is holding the old value even though a new value is set in Flex and the workflow tries to update the new value. I tried to update the data manual…"
Requester: Oliver Swenson · Status: Pending · Created: 2026-02-03
"Hello, We are seeing an instance (probably more) of a publish showing up in the plan module but not showing a record in the EW logs in the admin console. This resulted in at least two newly created items not flowing to flex and attaching to a season as it was the initial publish after being promoted…"
Requester: Saurabh Bhattacharya · Status: Open · Created: 2026-03-26
"Hi Team - Just wondering, can we enable the color deletion inbound to Vibe in the PLM connector? Currently it shows the message deletion event is not configured. We have some unused colors(around 2000) which the color team wants to delete from PLM. Without this, the colors will still remain in Vibe …"
Requester: Kim Hill · Status: Pending · Created: 2026-05-11
"When users try to Publish S1-27 (Product) FTW Running, they receive a “Plan publish failed” message. There are no alerts in the plan. Can you please advise as to what is causing that? Thank you! ![](https://vibeiq7921.zendesk.com/attachments/token/W4O6pKc9lrpp0N2fs9Csf0W0F/?name=image.png)"
Requester: Kate Morgan · Status: Open · Created: 2026-05-13
"Hi Hannah- We have uncovered an issue with a validation we have in place related to the Short Product Description property. Within the Plan the validation is working as expected, we are experiencing the issue in the Product Modal, Details tab. A validation error is being raised as expected, but the …"
Team MemberTaskHoursLast Logged
Ashutosh MulkiData / Loads7.5hFri May 08
Melissa SerranoConfiguration0.1hWed May 06
TOTAL7.6h
Team MemberHours% of totalLast Active
Ashutosh Mulki7.5h44%Fri May 08
Rakesh Raj3.7h21%Wed Apr 15
Mike Morgan3.5h20%Tue Apr 28
Hannah Casey1h6%Thu Apr 30
Raghavendra V1h6%Wed Apr 29
Melissa Serrano0.6h3%Wed May 06
TOTAL17.2h100%
TaskHours% of totalLast Active
Data / Loads7.8h45%Fri May 08
Integrations6.9h40%Wed Apr 15
General Meetings1h6%Thu Apr 30
Product Support1h6%Wed Apr 29
Configuration0.6h3%Wed May 06
TOTAL17.2h100%

URBN

CSM: Quach Hai · urbn.com · Billable to SOW ↑ Back to Master
🏥 Health
Hrs Last Wk
3.8h (▼ 7h)
Used
0h
Budget
📈 Pace
🗓 Renewal
Jul 20, 2028 (797d)
AIInsights for the Week · Sonnet 4.6
📅 CADENCE
Hours dropped from 10.8h → 3.8h week-over-week. CSM notes say go-live planned for 4/6 — that's 5 weeks ago. Decline likely reflects natural post-go-live tapering. Verify customer is now in support-contract phase, not project pause.
✅ ACTION
Confirm 4/6 go-live happened cleanly. If yes, transition messaging from 'project' to 'success' and set the first post-go-live success-metrics check-in for 6 weeks post-launch (~5/18).
📊 PATTERN
Health field is empty in HubSpot. Post-go-live is the right moment to set a baseline ('Healthy — successful go-live') to enable trend tracking from week one of the support phase.
✨ OPPORTUNITY
349h invested in implementation, integration reveal went well per notes (shoutout to Chris & Matt). Build a customer-story-ready writeup of the go-live for the next prospect conversation — this is referenceable work.
🆕 NEW
0
📬 OPEN
0
⏳ Pending
0
⏸ On Hold
0
🔍 In Review (ER)
0
Team MemberTaskHoursLast Logged
Anna PalmerSolution Approach Design  - SA/TA1.5hMon May 04
Prashant PawarConfiguration  - SA/TA1hTue May 05
Zach SibertConfiguration  - Sr. SA/TA1hTue May 05
Mike MorganConfiguration  - SA/TA0.2hThu May 07
TOTAL3.7h
Team MemberHours% of totalLast Active
Anna Palmer148.8h43%Mon May 04
Mike Morgan126.2h36%Tue May 12
Quach Hai32.5h9%Tue Oct 28
Ashutosh Mulki23h7%Tue Mar 31
Prashant Pawar7.5h2%Tue May 05
Melba Deena Lewis6.3h2%Thu Apr 16
Rakesh Raj4.3h1%Tue Mar 03
Zach Sibert1h0%Tue May 05
TOTAL349.7h100%
TaskHours% of totalLast Active
Configuration  - SA/TA146.2h42%Tue May 12
Discovery  - Sr. SA/TA41h12%Fri Oct 03
Solution Approach Design  - SA/TA30.5h9%Mon May 04
Configuration  - Project Management23h7%Tue Mar 31
Solution Approach Design  - Sr. SA/TA17.8h5%Mon Dec 29
General Project/Program Management  - SA/TA17h5%Tue Apr 21
Configuration  - Sr. SA/TA15.5h4%Tue May 05
General Meetings  - Sr. SA/TA14.2h4%Mon Dec 29
General Meetings - Implementation Consultant9.5h3%Fri Jan 23
General Meetings  - SA/TA8.2h2%Tue Apr 28
Integration Discovery  - SA/TA8h2%Tue Feb 03
Integration Build and Test  - SA/TA5.5h2%Tue Mar 24
User Training  - SA/TA4h1%Tue Feb 10
Integration Discovery  - Sr. SA/TA4h1%Tue Dec 16
Integration Build and Test  - Sr. SA/TA3.2h1%Fri Nov 21
General Project/Program Management  - Sr. SA/TA1.5h0%Tue Dec 30
Production Readiness  - SA/TA0.5h0%Thu Mar 26
TOTAL349.7h100%